防水工程施工方案
1、编制依据
1. Compiling the basis
根据北京市××建筑设计研究院设计的北京××工程的地下室防水工程设计图纸、《北京市地下室防水推荐做法》及本工程施工组织设计。
According to the design drawings of the basement waterproof
engineering of the Beijing x * * project in Beijing, the design of the
waterproof recommendation method of the basement of the Beijing and the
construction organization of the project.
2、工程概况
2. Engineering survey
地下室底板平面面积约××m2,分为六块,间有伸缩缝5条,伸缩缝宽度7cm。地下室负二层,底板到±0.000为6m,立面面积约为××m2。
The floor area of the basement floor is about X m2, which is
divided into six parts, including 5 expansion joints and 7cm expansion
joints. The basement has two layers, the bottom plate to + 0 is 6m, and
the facade area is about m2.
3、施工进度
3. Construction progress
The construction starts on October, October, and the construction
of the bottom plate is completed until the month of October, the height
of the protection wall is equal to the height of the protection wall,
and the other facades go along with the progress of the civil concrete
wall.